Camp Projects

Return to Photo Gallery
WMGSR052908-160 WMGSR052908-047 WMGSR052908-122
WMGSR052908-128

Quail Hill

Wood Shed

WMGSR052908-005

WMGSR052908-202

FSR Welcome Center

WMGSR052908-202
WMGSR052908-202

It's Here... !!

WMGSR052908-202
WMGSR052908-202

WMGSR052908-202
Landy Model

WMGSR052908-202

West Side front -
this faces the lake in front of Houseman Dining Hall.
It will (with donations) have a roofed porch across the entire front. At the center in front of the door will be the main stairway where we will have the FSR Memorial walkway lead to the road and camp.

 

  Well -
This well will supply the Welcome Center once an 8 x 8 building and electric are installed.
Vaulted ceiling view of lake from loft. - Insulation and T&G paneling ($3,500) required. View will be of Monkey Bridge in summer from Office area.  
  Southwest corner -
This side, with a deck (when donated) will face the
Monkey Bridge in summer. Deck will be about 15 feet
from road. A ramp will extend down the far side for HC access.
The deck will tie to the covered front porch at left.
 

 

 

Quail Hill

New Pavillion

(near ranges)

     
gatelayout

Quail Hill

Gate Building Project

mountinghardware
gateassembly-4 gateassembly-3 gateassembly-2
gateassembly-1 roadbermwork-4 roadbermwork-3
roadbermwork-2 roadbermwork-1 graveldelivery
lotentrywork break